City of Arcadia Goldring Well and PFAS Treatment Plant

2 Documents in Project

Summary

SCH Number
2025020361
Lead Agency
City of Arcadia
Document Title
City of Arcadia Goldring Well and PFAS Treatment Plant
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2025
Document Description
The proposed project consists of the construction and operation of a groundwater production well, the construction and operation of a Granular Activated Carbon (GAC) or Ion Exchange (IX) treatment system with pre-filters consisting of 2 pairs of vessels for the removal of Per and Polyfluoroalkyl substances (PFAS) from the extracted groundwater, the construction and operation of a new 30,000 gallons backwash tank with a new 4- inch diameter sewer pipeline, and the construction and operation of a new 30-inch diameter Reinforced Concrete Pipe (RCP) storm drain pipeline approximately 1,400 feet in length connecting from the cul-de-sac at Kardashian Avenue and Goldring Road, going westerly on Randolph Street and connecting to the existing 57-inch RCP on Peck Road.

Contact Information

Name
Tiffany Lee
Agency Name
City of Arcadia
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency / Project Applicant

Name
Jose Reynoso
Agency Name
City of Sierra Madre
Job Title
City Manager
Contact Types
Responsible Agency

Location

Cities
Arcadia
Counties
Los Angeles
Regions
Southern California
Cross Streets
Intersection of Kardashian Avenue and Goldring Road
Zip
91066
Total Acres
0.15
Parcel #
8532-019-900

Notice of Determination

Approving Agency
City of Arcadia
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
City of Arcadia, office of City Clerk, 240 West Huntington Dr., Arcadia, CA 91066

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Initial Environmental Study)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print