Modification 00933478-PCPU to Zoning Compliance Letter 88-ZD-0203 for the Development of a 215,221-square-foot Warehouse Building

Summary

SCH Number
2025020134
Public Agency
City of Irvine
Document Title
Modification 00933478-PCPU to Zoning Compliance Letter 88-ZD-0203 for the Development of a 215,221-square-foot Warehouse Building
Document Type
NOE - Notice of Exemption
Received
Posted
2/5/2025
Document Description
The project involves redevelopment of a 12.35-acre office campus with a 215,221-square-foot warehouse building. Vehicular access to the site will be provided via one driveway along Banting, one vehicle entrance located at the intersection of Telemetry and Alton Parkway, and one vehicle entrance at Herchel and Barranca Parkway.

Contact Information

Name
Alyssa Matheus
Agency Name
City of Irvine
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Name
Jacob Forby
Agency Name
California Acquisition, LLC
Job Title
Project Manager
Contact Types
Project Applicant

Location

Cities
Irvine
Counties
Orange
Regions
Southern California
Zip
92618
Other Location Info
1 & 3 Banting, Irvine, CA

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15302, Class 2 Replacement or Reconstruction
Reasons for Exemption
The project is exempt pursuant to CEQA Guidelines Section 15302 (Class 2) Replacement or Reconstruction, which allows for projects that intend to replace and/or reconstruct existing structures and facilities with new structures that will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the replaced structure. The project involves the demolition of existing buildings dedicated to professional offices to allow for development of a new warehouse building with ancillary professional offices on a previously developed site utilizing existing access points. The new warehouse structure and use is similar in scale and nature to the existing uses. An Access and Traffic Generation Memo prepared for the project concluded the project would result in a deintensification of uses on the site and demonstrated that it would generate a net reduction of vehicle trips to the site in comparison to the existing structure being replaced, thereby resulting in less than significant traffic impacts. Therefore, the project represents a replacement of existing onsite structures with a warehouse use serving a similar purpose while maintaining comparable or reduced capacity through existing conditions.
County Clerk
Orange

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print