Bear Necessity Timber Harvesting Plan 4-24-00166-CAL (Streambed Alteration Agreement EPIMS Notification No. EPIMS-CAL-56523-R2)
Summary
SCH Number
2025010935
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Bear Necessity Timber Harvesting Plan 4-24-00166-CAL (Streambed Alteration Agreement EPIMS Notification No. EPIMS-CAL-56523-R2)
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number EPIMS-CAL-56523-R2, pursuant
to section 1611 of the Fish and Game Code to the project Applicant, Sierra Pacific Industries. The projects are limited to water drafting, waterhole maintenance, temporary crossings, and a permanent vented ford crossing. Further explanation of the work can be referenced within the THP 4-24-00166-CAL.
Contact Information
Name
Carlee Cockrum
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Yanik Zuluaga
Agency Name
Calfire
Job Title
Forester II
Contact Types
Lead/Public Agency
Phone
Location
Counties
Calaveras
Regions
Northern California
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in Calaveras County, within CALWATER watershed Bear Creek, Lower Forest Creek, Lower Panther Creek, and their connecting tributaries; Township 6N, Range 14E, Section 6; Township 7N, Range 13E, Section 25; and Township 7N, Range 14E, Sections 14, 15, 19-24, 27-33; U.S. Geological Survey (USGS) Quad Map Devils Nose; Mount Diablo Base and Meridian.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.