Tantiss Modified Timber Harvesting Plan 4-24-00130-ELD (Streambed Alteration Agreement EPIMS Notification No. EPIMS-ELD-55653-R2)

Summary

SCH Number
2025010592
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Tantiss Modified Timber Harvesting Plan 4-24-00130-ELD (Streambed Alteration Agreement EPIMS Notification No. EPIMS-ELD-55653-R2)
Document Type
NOD - Notice of Determination
Received
Posted
1/21/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number EPIMS-ELD-55653-R2, pursuant to section 1611 of the Fish and Game Code to the project Applicant, Sierra Pacific Industries. The projects are limited to 1) installation of a corrugated metal pipe and construction and use of an off-channel waterhole, 2) construction of a rock-fill ford crossing, and 3) use of four existing water drafting sites. Further explanation of work can be referenced within the MTHP 4-24-00130-ELD.

Contact Information

Name
Carlee Cockrum
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
El Dorado
Regions
Northern California
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in El Dorado County, within CALWATER watersheds Union Valley Reservoir, Peavine Creek, Little Silver Creek, Sugar Pine Creek, and their connecting tributaries; Township 12N, Range 14E, Sections 28, 29, 31, 32 and 33 and Township 11N and Range 14E, Sections 4, 5, and 6 U.S. Geological Survey (USGS) Quad Map Riverton Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print