Sacramento 12 Terminous Safety Project
2 Documents in Project
Summary
SCH Number
2025010462
Lead Agency
California Department of Transportation, District 3
(DOT)
Document Title
Sacramento 12 Terminous Safety Project
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2025
Document Description
The California Department of Transportation (Caltrans) proposes the Sacramento 12 Terminous Safety Project. The project is located on State Route 12 in Sacramento County, between Post Miles 0.70 and 6.11. The total length of the project is 5.41 miles. This project was programmed for safety and updating roadways to current standards. The project will install concrete median barrier, improve left turn access at the intersection of Terminous Road, grind and overlay the existing pavement, extend or replace fair condition drainage systems, replace existing nonstandard/poor condition roadside signs, upgrade existing guardrails that do not the meet current standards, add Maintenance Vehicle Pullouts, and install a census station and closed circuit television.
Contact Information
Name
Jennifer Jones
Agency Name
Caltrans
Job Title
Environmental Planner
Contact Types
Lead/Public Agency
Phone
Location
Cities
Isleton
Counties
Sacramento
Regions
Northern California
State Highways
SR 12, SR 160
Schools
Riverview Middle School, Rio Vista High School, DH White Elemtry
Waterways
Sacramento River, Mokelumne River
Other Location Info
Project is located along State Route 12 in Sacramento County, between Post Miles 0.70 and 6.11. The total length of the project is 5.41 miles
Notice of Determination
Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.