Conditional Use Permit #23-0001 / Initial Study #23-0001

2 Documents in Project

Summary

SCH Number
2024121162
Lead Agency
Imperial County
Document Title
Conditional Use Permit #23-0001 / Initial Study #23-0001
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2025
Document Description
Project Description: The applicant, proposes CUP #23-0001 to construct and operate a grain feed mill located within the boundaries of a fully developed parcel consisting of an existing hay press, hay storage yard, seed mill, and ground installed solar field. Ground cover consists of compacted dirt, paved areas and concrete. The grain feed mill will be located on a +/- 5,730 square foot area of a +/- 35.80 acres parcel. The feed produced from the mill will be shipped out to the LVS Cattle Feeders Feed Yard located at 495 W. Heber Rd., El Centro, CA. The corn will be shipped in from Calipatria, CA and the wheat will come from the onsite seed mill. The proposed hours of operation for feed processing and delivery is 12 am to 6 am, Monday through Saturday. Daily traffic is expected to be 8 trucks a day entering and leaving the site along with 2 employee vehicles entering and leaving.

Contact Information

Name
Jim Minnick
Agency Name
Imperial County Planning & Development
Job Title
Director
Contact Types
Lead/Public Agency

Location

Cities
El Centro
Counties
Imperial
Regions
Countywide
Zip
92243
Parcel #
062-080-015-001

Notice of Determination

Approving Agency
Imperial County Planning Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
Imperial County Planning and Development Services, 801 Main St. El Centro, CA 92243

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print