Central Basin Municipal Water District Proposition 1 Recycled Water Customer Conversion for Disadvantaged Communities Project

Summary

SCH Number
2024121136
Lead Agency
Central Basin Municipal Water District
Document Title
Central Basin Municipal Water District Proposition 1 Recycled Water Customer Conversion for Disadvantaged Communities Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Land Use Designation Bellflower City Hall Public Quasi Public (P) Maywood Academy High School Public Quasi Public (P) San Antonio Elementary School Public Facilities Tanner Elementary School School Tweedy Elementary School Residential and Commercial Bloomfield Park Open Space Fedde Middle School Public Quasi Public / Junior High School Zoning Classification: Bellflower City Hall Public (P) Maywood Academy High School R-3 San Antonio Elementary School Public Facilities Tanner Elementary School M-1 Light Manufacturing Tweedy Elementary School Specific Plan Bloomfield Park Open Space Land (O-S) Fedde Middle School Public Quasi Public / Junior High School
Document Description
The proposed project involves the installation of new recycled water (RW) pipeline through installation of distinct recycled water segments within public rights-of-way and internally at the seven public sites that will be connected to the District’s new recycled water transmission system, as follows: • Bellflower City Hall, City of Bellflower o RW Pipeline (external): 0 lineal feet (LF) o RW Pipeline (internal): 175 LF • Maywood Academy High School, City of Maywood o RW Pipeline (external): 600 LF o RW Pipeline (internal): 0 LF • San Antonio Elementary School, City of Huntington Park o RW Pipeline (external): 45 LF o RW Pipeline (internal): 40 LF • Tanner Elementary School, City of Paramount o RW Pipeline (external): 20 LF o RW Pipeline (internal): 500 LF • Tweedy Elementary School, City of South Gate o RW Pipeline (external): 50 LF o RW Pipeline (internal): 80 LF • Bloomfield Park, City of Lakewood o RW Pipeline (external): 100 LF o RW Pipeline (internal): 225 LF • Fedde Middle School, City of Hawaiian Gardens o RW Pipeline (external): 6,000 LF o RW Pipeline (internal): 300 LF The RW pipeline will be installed beginning over a 6 month period beginning in 2025.

Contact Information

Name
Braden Yu
Agency Name
Central Basin Municipal Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Kaitlyn Dodson-Hamilton
Agency Name
Tom Dodson & Associates
Job Title
Vice President
Contact Types
Consulting Firm

Location

Cities
Bellflower, Hawaiian Gardens, Huntington Park, Lakewood, Los Angeles, Maywood, Paramount, South Gate, Tustin
Counties
Los Angeles, Orange
Regions
Southern California
Cross Streets
Randolph St, Pine Ave Randolph St, State St, Rosecrans Ave, Pinehurt Ave, Atlantic Ave, 215th,
Zip
various
Total Acres
less than 5
Parcel #
N/A
State Highways
I-105, SR-91, I-605, I-710, SR-1
Railways
Union Pacific
Airports
LAX, Long Beach
Schools
Various
Waterways
LA River
Township
3S
Range
12W
Section
18
Base
SBBM
Other Location Info
Cross Streets continued: 214th, Norwalk Blvd, Elaine Ave, Pioneer Blvd

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Education, California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 7 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California Santa Monica Mountains Conservancy (SMMC), California State Coastal Conservancy (SCC), California State Lands Commission (SLC), Colorado River Board, Department of General Services (DGS), Office of Historic Preservation, San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy (RMC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 15, State Water Resources Control Board, Division of Drinking Water, District 16, State Water Resources Control Board, Division of Drinking Water, District 22, State Water Resources Control Board, Division of Drinking Water, District 7, State Water Resources Control Board, Division of Drinking Water, District 8, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, University of California Natural Reserve System (UCNRS)
Development Types
Other (8,135 LF of recycled water pipeline)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Download CSV Download All Attachments New Search Print