North 99 Frontage Road West Resurfacing
Summary
SCH Number
2024121083
Public Agency
San Joaquin County
Document Title
North 99 Frontage Road West Resurfacing
Document Type
NOE - Notice of Exemption
Received
Posted
12/23/2024
Document Description
The project will consist of:
1. Cold planing 0.25 feet (3 inches) of existing pavement across the entire 32-foot roadway width and replacing the removed pavement with 0.25 feet (3 inches) of Hot Mix Asphalt (HMA) (Type A).
2. Performing repairs on areas with pavement structural failures using 0.25 feet (3 inches) of HMA (Type A) after completing the cold planing process.
3. Replenishing a 6-foot-wide shoulder backing along the west side of the roadway edge where needed to ensure proper conformance. ·
4. Applying a penetration treatment at all intersection radii and extend 50 feet beyond the intersections or as required to achieve conformity.
Contact Information
Name
Marilissa Loera
Agency Name
San Joaquin County
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
San Joaquin
Regions
Unincorporated
Cross Streets
Eight Mile Road, Hogan Lane, Armstrong Road, Scottsdale Road
State Highways
SR 99
Waterways
Pixley Slough, Bear Creek, Mosher Creek
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Existing Facilities (Sec. 15301 (c))
Reasons for Exemption
The project will repair an existing road and will not result in any major alterations to the configuration of the road. No additional vehicle travel lanes will be constructed.
County Clerk
San Joaquin
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.