SBD 215 MGS Project

Summary

SCH Number
2024120494
Public Agency
California Department of Transportation, District 8 (DOT)
Document Title
SBD 215 MGS Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/12/2024
Document Description
This project will close the guardrail gaps and upgrade the present guardrails to Midwest Guardrail System (MGS) along the existing right edge of pavement on Interstate 215 (I-215). The project will begin at Postmile 2.7 and end at Postmile 3.0. The MGS will also include 3 feet of vegetation control under it. There will be 150’ of staging area at the beginning location, which will allow the contractors to set up their equipment and/or store their materials. The work will be done within Caltrans right of way (ROW).

Contact Information

Name
Antonia Toledo
Agency Name
California Department of Transportation
Job Title
Acting Office Chief
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Regions
Southern California
State Highways
Interstate 215

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 15301
Reasons for Exemption
This project is exempt under Class 1 because the work consists of adding safety devices at an existing facility.

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print