Well 11 Treatment Project
2 Documents in Project
Summary
SCH Number
2024120358
Lead Agency
City of Lindsay
Document Title
Well 11 Treatment Project
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2025
Document Description
The Well 11 Treatment Project proposes to construct the following components:
• Site demolition, clearing and grubbing on approximately 3.4 acres;
• Construction of a perchlorate vessel foundation;
• Placement of perchlorate treatment vessels with initial load of resin;
• Installation of pretreatment cartridge filters;
• Construction of nitrate system foundations;
• Installation of a nitrate treatment system with tanks, resin, controls and softener;
• Installation of on-site piping;
• Placement of a brine holding tank;
• Construction of polyethylene double-lined evaporation ponds;
• Installation of associated electrical and controls;
• Well pump upgrades;
• Perimeter fencing; and
• Drive path for ingress and egress of the Project site
Construction Schedule:
Construction of the Project is anticipated to be completed within six (6) months, which would include grading, site preparation, and construction of the water treatment infrastructure. Generally, construction would occur between the hours of 7:00 am and 5:00 pm, Monday through Friday, excluding holidays. Post-construction activities would include system testing, commissioning, and site clean-up. Construction would require temporary staging and storage of materials and equipment. Staging areas would be located on-site.
Equipment:
Construction equipment would likely include an excavator, backhoes, graders, skid steers, loaders, crane, and hauling trucks.
Operation and Maintenance:
Operation and maintenance of the water treatment facility would be performed by the existing City maintenance staff or contracted staff. Operation and maintenance associated with the evaporation pond alternative would consist of monitoring the ponds for leakage, occasional removal of crystalized salt from the bottom of the ponds, transferring the salt into super sacks and repair of the liner, as necessary. Brine deliveries to the CleanHarbors Buttonwillow facility would occur approximately every other day utilizing one ( 1) truck
Contact Information
Name
Neyba J. Amezcua
Agency Name
City of Lindsay
Job Title
Project Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Lindsay
Counties
Tulare
Regions
Citywide
Cross Streets
Mariposa and Hwy 65
Zip
93247
Parcel #
199-140-038, 199-140-048, 199-140-049, and 199-200-028
State Highways
65
Railways
Sjrr
Schools
Jefferson, Lincoln, Reagan , Lindsay, Washington
Township
20s
Range
26E
Section
12
Base
MDB&M
Notice of Determination
Approving Agency
City of Lindsay
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
251 E Honolulu Street Lindsay CA 93247
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.