1900 Broadway, Redwood City, CA 94063
Summary
SCH Number
2024111044
Public Agency
City of Redwood City
Document Title
1900 Broadway, Redwood City, CA 94063
Document Type
NOE - Notice of Exemption
Received
Posted
11/27/2024
Document Description
Construction of a 7-story, 92-feet tall, approximately 256,205 square foot mixed-use commercial office building with approximately 10,060 sq. ft. of ground floor retail space, approximately 1,000 sq. ft. for a community room, 715 sq. ft. for a storage space, and an approximately 12,085 sq. ft. public plaza.
Contact Information
Name
Melinda Hue
Agency Name
City of Redwood City
Job Title
CEQA Coordinator
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Redwood City
Counties
San Mateo
Regions
Citywide
Parcel #
053-231-210, 053-231-200
Other Location Info
1900 Broadway (APN: (APN: 053-231-210, 053-231-200) and Spring St. (between Main and Walnut Streets)
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15183
Reasons for Exemption
A CEQA Consistency Checklist (September 13, 2024) prepared in accordance with CEQA Guidelines Section 15183 determined that: determined that: (1) no peculiar impacts to the 1900 Broadway Project component or its site have been identified, (2) there are no potentially significant effects that were not analyzed in the prior Downtown Precise Plan (DTPP) EIR (SCH# 2006052027)/DTPP Subsequent EIR (SEIR, SCH# 2021090249), (3) there are no significant off-site and/or cumulative impacts which were not discussed by the EIR/SEIR, (4) no substantial new information has been identified which results in an impact which is more severe than anticipated by the EIR/SEIR, and (5) the Project applicant will undertake feasible mitigation measures specified in the EIR/SEIR to mitigate Project-related significant impacts. The mitigation measures have been included in the Project as conditions of approval. As such, the Project is exempt from further environmental review pursuant to CEQA Guidelines Section 15183. The Development Agreement was adopted by ordinance on November 25, 2024. The project was conditionally approved subject to approval of the ordinance above on October 28, 2024.
County Clerk
San Mateo
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.