Camino Pablo Single-Family Residential Subdivision, Rezone, General Plan Amendment, and Development Plan

Summary

SCH Number
2024110934
Lead Agency
Contra Costa County
Document Title
Camino Pablo Single-Family Residential Subdivision, Rezone, General Plan Amendment, and Development Plan
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Agricultural/Grazing
Document Description
The Camino Pablo Single-Family Residential Subdivision, Rezone, General Plan Amendment, and Development Plan project includes Major Subdivision application CDSD23-09646. Rezone application CDRZ23-03270, General Plan Amendment application CDGP21-00004, and Development Plan application CDDP23-03012, to allow development of the southern 7.9 acres of the 23.9-acre project site consisting of a residential subdivision of 13 single-family residences with attached accessory dwelling units (ADUs) incorporated into 11 of the residences. The remaining northern 16.0 acres of the site would remain as agricultural open space. The project site is a legal lot in the AL Agricultural Lands, General Plan land use designation. The applicant has submitted a Major Subdivision application to create an 18-lot subdivision as shown below, including 13 residential lots (Parcels 1 through 13), open space Parcel A, landscape Parcels B and C, and street Parcels D and E. Parcels 1 through 13 and Parcels B through E encompass the proposed residential development on the southern portion of the site. Parcel A is the northern 16,0 acres of the site that would remain as open space. To allow the Major Subdivision to proceed the applicant requests a General Plan Amendment to redesignate the southern 7.9 acres as SL Single-Family Residential–Low Density to allow multiple single-family residences on this portion of the site. The applicant also requests that the County Rezone the southern 7.9-acre portion of the project site from the A-2 General Agricultural District to a P-1 Planned Unit District and has submitted a Development Plan application for the P-1 District to allow development of 13 one- and two-story detached single-family residences on individual lots. The lots would range in size from 15,368 square feet to 27,827 square feet, with an average lot size of approximately 19,969 square feet. Attached ADUs would be included in 11 of the homes, while Parcels 7 and 8 would not include an ADU. The 7.9-acre southern portion would have a net development area of 6.65 acres (without street Parcels D and E) with a resultant net density of 1.95 residential units per acre, which would be within the 1.0 and 2.9 single-family units per net acre density range for the SL General Plan land use designation. Parcel Land Use Size (Sq. Ft.) (Acres) 1 Residential 21,352.00 0.49 2 Residential 20,234.00 0.46 3 Residential 18,516.00 0.43 4 Residential 18,276.00 0.42 5 Residential 17,064.00 0.39 6 Residential 19,247.00 0.44 7 Residential 22,039.00 0.51 8 Residential 16,448.00 0.38 9 Residential 27,827.00 0.64 10 Residential 27,090.00 0.62 11 Residential 19,281.00 0.44 12 Residential 15,368.00 0.35 13 Residential 16,861.00 0.39 A Open Space 697,036.00 16.00 B Landscaping 6,948.00 0.16 C Landscaping 22,916.00 0.53 D Street 44,431.00 1.02 E Right-of-Way 10,454.00 0.24 Total 1,041,388.00 23.91 The applicant expects project construction to begin in June 2024 for a total of 32 months, including 14 months for grading, infrastructure installation, and building pads, and 18 months for homes construction. The 13 residential lots would have access onto Camino Pablo via a new access road terminating in a cul-de-sac. The cul-de-sac would have a sidewalk on the north/east side. The opposite side of the cul-de-sac would be lined with several stormwater bioretention and filtration planter strips. The cul-de-sac would form the fourth leg of the Camino Pablo / Tharp Drive intersection. Tharp Dive is a two-lane residential collector street that intersects with Camino Pablo and a number of local residential streets. Camino Pablo is a two-lane arterial street that travels northwest from the Camino Pablo / Tharp Drive intersection to connects to Canyon Road – Moraga Road, which is a two – to four-lane County-designated arterial road. The residential lots would comprise 5.95 acres of the 7.9-acre gross development area, with the remaining acreage dedicated to the street right-of-way (1.26 acres) and common area landscaping (0.69 acres). The residential lots would have minimum 20-foot front yard setbacks, 15-foot rear yard setbacks, 10-foot side yard setbacks, and a minimum 25 feet aggregate side yard setback. The common area landscaping would provide visual buffers that would separate the homes from Camino Pablo. Parcel D would be the cul-de-sac, which would be dedicated to Contra Costa County. Parcel E consists of a 0.24-acre area adjacent to Camino Pablo, which would be dedicated to the Town of Moraga. The location of the proposed homes on the southern portion of the site would preserve the higher elevations of the site and thereby, would preserve the visually prominent hillside in the northern and eastern portions of the site and adjoining agricultural open space land to the east. The residential development would retain the natural features of the land to the extent feasible and most of the homes would be developed on split pads, thereby stepping the homes up or down the hillside, depending on their orientation. The homes have been horizontally massed to minimize view obstruction. The homes would be custom homes, each having a unique design but all homes would be in a “Transitional” style of architecture that blends traditional forms, materials, and colors with modern exterior and interior elements. The residences would be designed to be energy efficient and constructed to meet the stringent fire resistance requirements for development in a Wildland/Urban Interface Zone. Most of the homes would have two stories, while the homes on the southernmost lots (Parcels 7 and 8) would be one story. The homes would range in size from 3,463 square feet to 4,474 square feet, not including garages or porches. The ADUs would all one-bedroom units with separate kitchen/living/dining areas, ranging in size from 920 square feet to 1,117 square feet. The onsite hillside contours that characterize the local topography would be retained. Project grading would extend onto the adjoining property to the east and would slightly lower this hillside crest running along and just outside the east side of the project parcel from the approximately 705 feet to 702 feet. To stabilize the site, slide conditions that affect the southern portion of the site would be repaired. Although grading would entail cuts and fills totaling 59,600 cubic yards of soil, grading would be balanced on site, requiring no import or export of fill. A 4-foothigh retaining wall would extend along the rear of the easternmost lots (Parcels 1 through 5). Additional retaining walls would be placed on some of the individual lots in order to accommodate the homes and yards. Retaining walls would also be placed on the west side of the project site. Exposed retaining walls would be landscaped with a variety of ornamental trees, shrubs, and grasses that are intended to obscure the walls upon maturity. The project includes a connection to an existing storm drain system that currently collects runoff from the site and directs stormwater flow to Moraga Creek. The stormwater runoff from the site would be treated by bioretention basins and discharged into the proposed onsite storm drain system prior to entering the existing storm drain system. Parcel A would continue to discharge into an existing v-ditch, located adjacent to Camino Pablo that ties into the existing storm drain system. As part of the project, Camino Pablo would be widened from Tharp Drive south to the southern end of the project site frontage. The existing right-of-way, which varies between roughly 46 feet and 59 feet would be expanded to a 68-foot right-of-way. The existing 28-foot-wide roadway would be expanded to 36 feet, and would include a curb and gutter on both sides. The existing curb and gutter on the west side of Camino Pablo would remain, while the existing 8-foot-wide sidewalk extending along the project site frontage would be replaced with a new, slightly relocated 8-foot-wide sidewalk. The property owner intends to dedicate the additional right-of-way to the Town of Moraga.

Contact Information

Name
Adrian Veliz
Agency Name
Contra Costa County Department of Conservation and Development
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Moraga
Counties
Contra Costa
Regions
San Francisco Bay Area, Unincorporated
Cross Streets
Camino Pablo/Tharp Ave
Zip
94556
Total Acres
23.9 acres

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 4, State Water Resources Control Board, Division of Water Rights, California Department of Toxic Substances Control (DTSC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
State Reviewing Agency Comments
California Department of Toxic Substances Control (DTSC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
Development Types
Residential (Units 13, Acres 7.9)
Local Actions
General Plan Amendment, Planned Unit Development, Site Plan, Rezone, Land Division (Subdivision, etc.)
Project Issues
Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology/Soils, Hydrology/Water Quality, Noise, Public Services, Tribal Cultural Resources, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print