B-TAP Reservoir Improvements Project

Summary

SCH Number
2024110632
Public Agency
City of Carlsbad
Document Title
B-TAP Reservoir Improvements Project
Document Type
NOE - Notice of Exemption
Received
Posted
11/20/2024
Document Description
Reservoir B of the Tri-Agencies' Pipeline facilities, known as the B-TAP Reservoir, is a 6-million-gallon reservoir built in 1985. The reservoir is located at the east end of Bluff Court within the Calavera Hills community. This project will construct drainage improvements to safely convey stormwater runoff away from the site, paving improvements to improve worker safety and fencing improvements for enhanced site security. The project will construct 4,990 square feet of asphalt concrete paving, 4,020 square feet of pervious asphalt concrete paving, and asphalt concrete berms to direct stormwater runoff to new stormwater catch basins and a new curb outlet. The paving improvements will improve safety for workers during and after rains and reduce sediment flowing off the site from the unpaved access road.

Contact Information

Name
NICOLE MORROW
Agency Name
CITY OF CARLSBAD PLANNING DIVISION
Job Title
ASSISTANT PLANNER
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad
Counties
San Diego
Regions
Southern California
Other Location Info
BLUFF COURT, CARLSBAD, CA

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302(C) - Replacement or Reconstruction
Reasons for Exemption
The California Environmental Quality Act ("CEQA"), and its implementing regulations ("CEQA Guidelines") adopted by the Secretary of the California Natural Resources Agency, list classes of projects that have been determined not to have a significant effect on the environment and as a result are exempt from further environmental review under CEQA. City staff completed a review of the project and potential environmental impacts associated with the project pursuant to CEQA and concluded that the project qualified for an exemption pursuant to CEQA Guidelines section 15302 (Replacement and Reconstruction). The CEQA Guidelines include a list of classes of projects which have been determined not to have a significant effect on the environment and which shall, therefore, be exempt from the provisions of CEQA. CEQA Guidelines Section 15302 is a Class 2 exemption and consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. The proposed project will not modify the capacity or purpose of the reservoir as the improvements are intended to divert stormwater and enhance site safety and security.
County Clerk
San Diego

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print