Maverik Fueling Station

Summary

SCH Number
2024110193
Lead Agency
City of Indio
Document Title
Maverik Fueling Station
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Vacant and undeveloped/Heavy Industrial (IH)/Workplace and Employment District (WEP)
Document Description
The project proposes to subdivide an 8.62-acre site into two lots. Approximately 3.37-acres of the 8.62-acre project site will be utilized for the proposed project while 5.26 acres will remain undeveloped lot. The project proposes the development of a gas station with 10 fuel pumps under a single canopy (totaling 7,214 square feet [SF]), a four-lane diesel/ commercial vehicle fueling area, and a 5,951 SF convenience store building. Additional improvements include three underground fuel storage tanks, a truck scale, trash enclosure, generator, a tire pressure air station, parking, landscaping, drainage, utility connections, and access improvements. Vehicular access would be provided via two ingress/egress driveways; one along the north side of Avenue 45 aligned with Commerce Street, and one along the east side of Golf Center Parkway.

Contact Information

Name
Jose Luis Jara
Agency Name
City of Indio
Job Title
Assistant Planner
Contact Types
Lead/Public Agency

Name
Christine J. Willis
Agency Name
Willis Environmental Planning
Job Title
President
Contact Types
Consulting Firm

Name
Kevin Deis
Agency Name
Maverik, Inc.
Job Title
Senior Planning Project Manager
Contact Types
Project Applicant

Location

Cities
Indio
Counties
Riverside
Regions
Citywide
Cross Streets
Avenue 45 and Golf Center Parkway
Zip
92201
Total Acres
8.62
Jobs
15
Parcel #
611-330-025
State Highways
Interstate 10
Railways
None
Airports
None
Schools
Amistad Continuation High School
Waterways
Whitewater River

Notice of Completion

Development Types
Commercial (Fueling Station and Convenience Store)(Sq. Ft. 5951, Acres 3.37, Employees 15)
Local Actions
Site Plan, Use Permit, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Vegetation
Public Review Period Start
Public Review Period End

Attachments

Download CSV Download All Attachments New Search Print