Pock Lane Improvements
Summary
SCH Number
2024101256
Public Agency
San Joaquin County
Document Title
Pock Lane Improvements
Document Type
NOE - Notice of Exemption
Received
Posted
10/29/2024
Document Description
The project will consist of:
1. Grinding and removing existing asphalt concrete (AC) to a depth of 0.25 feet and placing 0.25
feet HMA (Type A) from south end of the project to the Carpenter Road (S) intersection.
2. Placing 0.25 feet HMA overlay from Carpenter Road (N) intersection to the Duck Creek bridge deck.
3. Grinding and removing existing AC to a depth of 0.25 feet and placing 0.25 feet HMA from the Duck Creek bridge deck to approximately 160 feet south of Loomis Road (right lane only).
4. Repairing pavement structural failure areas to a depth of 0.25 feet [HMA (Type A)] beneath the grind & replacing section south of Carpenter Road, with a total repair depth of 0.50 feet. Full depth 0.50 feet HMA (Type A) pavement repairs from Carpenter Road (N) to the north project limit.
5. Placing shoulder backing (3 feet wide at an 8% slope) along the west side of the roadway from south end of the project to Carpenter Road (S), and 2 feet wide on the east side from Carpenter Road (N) to 30 feet south of the Duck Creek bridge deck.
6. Constructing approx. 3,650 feet of 4-foot-wide Portland Cement Concrete (PCC) Walkway on west side of Pock Lane and the south side of Loomis Road.
7. Constructing approximately 2,100 feet of HMA Dike (Type A) along the west side of the existing EP from Carpenter Road (N) intersection to approximately 45 feet south of the Duck Creek bridge deck.
8. Reconstructing 6 to 8-foot HMA Driveways (Type D) from back of new PCC walkway to Right-of-Way line.
9. Constructing new drainage ditch and install new 12-foot Corrugated Steel Pipe (CSP) cross drains at all driveways.
10. Supplying Americans with Disabilities Act (ADA)-compliant detectable walking surfaces at the ends of walkways at each intersection.
11. Constructing a curb ramp to connect the new PCC walkway to the existing curb, gutter, and sidewalk in the City of Stockton Right-of-Way at the south end of the project.
12. Isolated areas of Pock Lane north of Loomis Road will receive pavement repair only (0.50 feet).
Contact Information
Name
Marilissa Loera
Agency Name
San Joaquin County
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
San Joaquin
Regions
Unincorporated
Cross Streets
Carpenter Road, Loomis Road, 11th Street
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Existing Facilities (Sec. 15301 (c))
Reasons for Exemption
The project will repair an existing road and will not result in any
major alterations to the configuration of the road. Additional
pedestrian facilities will be constructed, but no additional
vehicle travel lanes will be constructed.
County Clerk
San Joaquin
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.