Reservoir 1 Water Treatment Plant Backwash Waste Pump Replacement Project

Summary

SCH Number
2024101210
Public Agency
El Dorado Irrigation District
Document Title
Reservoir 1 Water Treatment Plant Backwash Waste Pump Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/29/2024
Document Description
The El Dorado Irrigation District (District) proposes to replace the existing backwash waste pumps at the Reservoir 1 Water Treatment Plant (Res 1 WTP) Backwash Water Return Pump Station (BWRPS). The pumps are a critical part of the water treatment process that return wash water generated during a filter backwash to the head works of the plant. Additionally, the BWRPS is used to pump settled solids from the sedimentation basin to the drying beds on an annual basis while the plant is offline for maintenance. The BWRPS pumps are at the end of their useful life and are in need of replacement to maintain service and water treatment reliability. The replacement of the pumps will involve the removal of the existing pumps, installation of the new pumps, and minor mechanical and electrical work. All construction and equipment staging activities will occur within the existing Res 1 WTP facility and involve no new ground disturbing activities. Any construction debris that is removed from the Project area will be disposed of in compliance with all applicable regulatory requirements. The pumps are an in-kind replacement and will not increase or expand drinking water treatment capacity. The lead time for purchasing the pumps is estimated to be approximately 32 weeks and installation is planned to be performed by District crews in 2025.

Contact Information

Name
Brian Deason
Agency Name
El Dorado Irrigation District
Job Title
Environmental Resources Supervisor
Contact Types
Lead/Public Agency

Location

Cities
Placerville
Counties
El Dorado
Regions
Countywide
Cross Streets
Pony Express Trail/Gilmore Road
Zip
95726
Total Acres
0.01
Parcel #
101100061
State Highways
Highway 50
Railways
NA
Airports
NA
Schools
Pinewood Elementary
Waterways
NA
Township
11N
Range
12E
Section
35
Other Location Info
Reservoir 1 Water Treatment Plant

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302
Reasons for Exemption
The project consists of the replacement of existing pumps where the new pumps will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the pumps replaced. None of the applicable exceptions to this exemption, as identified under CCR, Title 14 section 15300. 2, are valid for this project, including location in an area of critical concern, significant effect due to unusual circumstances, scenic highways, hazardous waste sites, cumulative effect, and historical resources.
County Clerk
El Dorado

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.