Lake And Streambed Alteration Evaluation

2 Documents in Project

Summary

SCH Number
2024101065
Lead Agency
California Department of Transportation, District 9 (DOT)
Document Title
Lake And Streambed Alteration Evaluation
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2024
Document Description
Caltrans proposes to improve roadway drainage and reduce erosion at two unnamed drainage system locations that on U.S. Route 395 near the community of Lee Vining. Rock slope protection will be replaced at the culvert outfall and channel at location 1. The culverts will remain in place. At location 2, the culvert will be removed and replaced in-kind with the same sized pipe and new rock slope protection will be installed at the culvert outfall.

Contact Information

Name
Ryan Spaulding
Agency Name
California Department of Transportation (District 9)
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Lead/Public Agency

Location

Cities
Lee Vining
Counties
Mono
Regions
Countywide
Cross Streets
U.S. Route 395 and 0.2 mile north of Visitor Center Road and U.S. Route 395 and First Street.
Zip
93541
State Highways
120W, 395
Airports
Lee Vining Airport
Schools
Lee Vining High School, Lee Vining Elementary School
Waterways
Lee Vining Creek
Other Location Info
On U.S. Route 395, at post miles 51.5 and 52.1, near Lee Vining in Mono County.

Notice of Determination

Approving Agency
California Department of Transportation (District 9)
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mono
Final Environmental Document Available at
Caltrans District 9 Office, 500 South Main Street, Bishop, CA 93514.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print