State Route 78 Julian Asset Management Project

3 Documents in Project

Summary

SCH Number
2024100916
Lead Agency
California Department of Transportation, District 11 (DOT)
Document Title
State Route 78 Julian Asset Management Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2025
Document Description
The California Department of Transportation (Caltrans) proposes to rehabilitate and enhance various assets on State Route 78 in eastern San Diego County, between post miles 37.2 and 60.0. Proposed improvements include pavement rehabilitation; culvert rehabilitation; Complete Streets and mobility elements, such as Americans with Disabilities Act curb ramps; and safety/roadside element improvements, including sign panels, guardrails, rumble strips, and dikes.

Contact Information

Name
Cristina Graciano
Agency Name
Caltrans, District 11
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Julian & Ramona
Counties
San Diego
Regions
Countywide
State Highways
State Route 78
Other Location Info
postmiles 37.2 to 60.0 near Ramona from Hatfield Creek Bridge to Wynola Road near Julian

Notice of Determination

Approving Agency
Caltrans - District 11
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
4050 Taylor St. San Diego, CA 92110; or email cristina.graciano@dot.ca.gov

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print