Afterbay Reservoir Lining and Spillway Replacement Project
Summary
SCH Number
2024100602
Public Agency
Berrenda Mesa Water District
Document Title
Afterbay Reservoir Lining and Spillway Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/15/2024
Document Description
The Afterbay Reservoir is owned and operated by Berrenda Mesa Water District (District) and currently has excessive seepage losses. The Project consists of lining the reservoir and replacing the spillway. Project activities include: excavating and removing excess sediment from the bottom of the reservoir; removing riprap; finish grading and placing the HOPE liner; anchoring the upper edge of the liner in anchor trenches at the top of the embankments and with batten strips along structures; replace the existing concrete spillway.
Contact Information
Name
Mark Gilkey
Agency Name
Berrenda Mesa Water District
Job Title
General Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
unincorporated area
Counties
Kern
Regions
Southern California
Other Location Info
APNs: 043-190-39, 043-190-30, 043-190-36, 043-190-37, 043-190-38, 043-190-32, 043-190-33, 043-190-34, 043-131-08, and 043-170-12
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 15301 (Existing Facilities) and class 15302 (Reconstruction)
Reasons for Exemption
The project proposes to clean out sediment from the Afterbay Reservoir and line it
with a geomembrane liner. The existing concrete spillway will be replaced within the
existing footprint. The project will not change the reservoir's use or purpose.
County Clerk
Kern
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.