Atlas Rock Vineyard Agricultural Erosion Control Plan #P22-00031-ECPA

2 Documents in Project

Summary

SCH Number
2024100488
Lead Agency
Napa County
Document Title
Atlas Rock Vineyard Agricultural Erosion Control Plan #P22-00031-ECPA
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2024
Document Description
Agricultural Erosion Control Plan involving the proposed clearing of vegetation, earthmoving, and installation and maintenance of erosion control measures associated with the development of approximately 1.34 gross acres of new vineyard (i.e., development area, proposed clearing limits; 0.99 net vines acres) within two vineyard blocks. The project would convert to vineyard approximately 1.05 acres of pre-fire mixed oak woodland and 0.1-acre of non-native grassland. No trees would be removed, as the trees were burned and subsequently removed (stumps in place) following the 2017 Atlas fire. The project area at time of submittal consisted of recovering vegetation (predominantly wavy-leaf ceanothus), annual grassland and ruderal area. Project would avoid 100% of sensitive holly-leaf ceanothus population on site, and would restore an approximate 0.4-acre oak woodland area. Average slopes within the project area ranges from 8% to 11%.

Contact Information

Name
PAMELA F ARIFIAN
Agency Name
County of Napa
Job Title
Planner III
Contact Types
Lead/Public Agency

Location

Cities
Napa, Unincorporated area
Counties
Napa
Regions
Unincorporated
Cross Streets
Atlas Peak Road
Zip
94558
Total Acres
4.84
Parcel #
033-010-059
State Highways
N/A
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Milliken Creek
Township
6N
Range
3W
Section
6
Base
MDM
Other Location Info
Parcel is located within the Milliken Reservoir Sensitive Domestic Water Supply Drainage within the Napa River watershed and AW Zoning.

Notice of Determination

Approving Agency
Napa County
Approving Agency Role
Lead Agency
Approved On
County Clerk
Napa
Final Environmental Document Available at
1195 3rd Street, Suite 210, Napa CA 94559

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Erosion Control Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print