Main Street Multi-Use Path

Summary

SCH Number
2024100481
Public Agency
City of Mammoth Lakes
Document Title
Main Street Multi-Use Path
Document Type
NOE - Notice of Exemption
Received
Posted
10/11/2024
Document Description
The project involves construction of an approximately 1,635 LF class 1 multi-use path (MUP) that will provide for bicycle and pedestrian travel along the south side of State Route 203 (Main Street) between Minaret Road and Callahan Way. The proposed 10-foot wide MUP will provide connectivity between the existing Town Loop and Lakes Basin paths and major destination points, such as commercial areas, school facilities, housing, and recreational amenities. The proposed path segment will facilitate safe travel for non-motorized user groups by providing a designated area along a main road.

Contact Information

Name
Amy Callanan
Agency Name
Town of Mammoth Lakes
Job Title
Engineering Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Mammoth Lakes
Counties
Mono
Regions
Citywide
Cross Streets
Main Street between Callahan Way and Minaret Road
Zip
93546
State Highways
203

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15304
Reasons for Exemption
The creation of bicycle lanes on existing rights-of-way are considered a minor alteration to land and are exempt. The project represents a negligible expansion of an existing use.
County Clerk
Mono

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print