Tulelake Waterline Project

Summary

SCH Number
2024100283
Lead Agency
City of Tulelake
Document Title
Tulelake Waterline Project
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2024
Document Description
The City of Tulelake proposes to address deficiencies present in water distribution system components. This proposed project includes the planning and design to replace backflow preventers, new water storage tank (to replacing one existing tank), new master water meters to four outside water districts, replacement of 1,000 ft of asbestos cement pipe within the distribution system, the rehabilitation of two existing wells, replacement of 500 feet of aged cast iron leaky water main, replacement of five service connections, reconnection of two existing fire hydrants, installation of an emergency potable water re-filling station with a drinking fountain, and emergency use water bottle provisions. The scope of work will include replacement of valves and other plumbing vaults at four locations, waterline replacement in four alleyways, the replacement of new water tanks, and well rehabilitations in an undeveloped lot and a portion of the Water Pumping Facility and public works yard.

Contact Information

Name
Jenny Coelho
Agency Name
City of Tulelake
Job Title
City Hall Administrator
Contact Types
Lead/Public Agency

Location

Cities
Tulelake
Counties
Siskiyou
Regions
Citywide
Cross Streets
Main & F Street; Siskiyou Street & Modoc Ave; 1st Street; Park Street; G Street & Modoc Ave
Zip
96134
Total Acres
10.57
Jobs
1
Parcel #
050-142-130-000 and 050-051-010-000
State Highways
California State Highway 139
Railways
Union Pacific
Airports
None
Schools
Tulelake Elementary and Tulelake Middle and High School
Waterways
Bureau of Reclamation Irrigation Canals
Township
48 N
Range
4E
Section
35
Base
MDM

Notice of Determination

Approving Agency
City of Tulelake
Approving Agency Role
Lead Agency
Approved On
County Clerk
Siskiyou
Final Environmental Document Available at
https//:cityoftulelake.com

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Tulelake Water Project CEQA Checklist)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print