Propeller Drive Extension Project (DPW 18-20)
2 Documents in Project
Summary
SCH Number
2024100208
Lead Agency
City of Paso Robles
Document Title
Propeller Drive Extension Project (DPW 18-20)
Document Type
NOD - Notice of Determination
Received
Posted
11/27/2024
Document Description
The project is a public improvement project that includes extending Propeller Drive approximately 1,115 feet east from its current terminus to connect with Taxiway B of the Paso Robles Municipal Airport (Airport) and construction of a new roadway (Empennage Drive), which will be approximately 660 feet long and connect the new section of Propeller Drive to the CAL FIRE Paso Robles Attack Base at the north end of Taxiway B. The new roadways will be a minimum of 25 feet wide.
The project would fill and realign an intermittent drainage (Drainage 1) and install a new soft bottom culvert within Drainage 2. Drainage 3 will be realigned through natural bottom swales to direct flows to the proposed culvert and eventually reconnect with Drainage 1 on the north side of Propeller Drive.
The extension of Propeller Drive and installation of the culvert are expected to impact all three mapped drainages. The project has been designed to avoid all impacts to mapped wetland features. Once completed, overall vehicle traffic and circulation will be improved.
Based on engineer’s estimates, the project will result in the following:
• Grading Estimates:
Total Cut: 1,323 cubic yards
Total Fill: 9,185 cubic yards
Total Export: 8,462 cubic yards
• Area of Disturbance:
Ground disturbance/excavation: 135,000 square feet (3 acres)
Pavement overlay/new impervious surface area: 61,050 square feet
Contact Information
Name
Ditas Esperanza
Agency Name
City of El Paso de Robles
Job Title
Capital Projects Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Paso Robles
Counties
San Luis Obispo
Regions
Southern California
Cross Streets
Airport Road at Propeller Drive
Zip
93446
Total Acres
3
Parcel #
025-450-005
State Highways
46 East
Railways
n/a
Airports
Paso Robles Municipal
Schools
n/a
Waterways
Estrella River, Huer Huero Creek, Dry Creek, unnamed drainages
Township
26S
Range
12E
Section
12
Base
MDPM
Notice of Determination
Approving Agency
City of El Paso de Robles
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Luis Obispo
Final Environmental Document Available at
1000 Spring Street, Paso Robles, CA 93446
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.