Suscol Headwaters Park

Summary

SCH Number
2024100066
Lead Agency
Napa Open Space District (NOSD)
Document Title
Suscol Headwaters Park
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The project site is designated as Agricultural Watershed/Open Space in the Napa County General Plan and Watershed in the Solano County General Plan.
Document Description
Adoption of an amended Park Development Plan by the Napa County Regional Park and Open Space District to allow the Suscol Headwaters Park to be improved and operated as a publicly-accessible open space and park and recreational facility. Access would be via a new entrance, +/- 0.75 acre parking lot, and trailhead off North Kelly Road across from Camino Dorado as well as through the existing Napa Solano Ridge Trail connection to Skyline Wilderness Park. Proposed development primarily consists of natural-surface, multi-use, non-motorized trails. Phase 1 of the Suscol Headwaters Park Development Plan was adopted in January 2020, including opening the park to the public through Skyline Park and approval of a trail network north of the main Jameson Canyon ridgeline. This project would expand the Park Development Plan to include Phase 2 development south of the main Jameson Canyon ridgeline including a trail network and a trailhead parking lot located off North Kelly Road, along with making some minor changes to the adopted Phase 1 trail plan. No development is presently proposed in Solano County. The proposed Park Development Plan and additional supporting information are available online at https://napaoutdoors.org/documents/suscol-headwaters-park-phase-2-park-development-plan/.

Contact Information

Name
Chris Cahill
Agency Name
Napa County Regional Park and Open Space District
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated
Counties
Napa
Regions
Unincorporated
Cross Streets
North Kelly Road and Camino Dorado (trailhead parking lot)
Zip
94558
Total Acres
+/-709
Parcel #
045-360-013, -014, -022, & 057-030-014 (Napa Co.) 0148010180 & 0148010190 (Solano Co.)
State Highways
12, 29
Waterways
Suscol Creek, Fagan Creek, Sheehy Creek
Township
5N
Range
3W
Section
29
Other Location Info
Unincorporated Napa County, access from Skyline Wilderness Park or via a new entrance off of North Kelly Road.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Other (Regional Park and Open Space Preserve)
Local Actions
Park Development Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Fiscal Impacts, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print