Right-of-way Improvement Project

Summary

SCH Number
2024091145
Public Agency
City of Lemoore
Document Title
Right-of-way Improvement Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/30/2024
Document Description
This project will include the installation of curb, gutter, sidewalk, and street improvements at selected residential locations, as outlined in the table below. Additionally, the project will involve the construction of an extension of Oleander Avenue to D Street, along with related infrastructure enhancements. The improvements for the Oleander Avenue extension will consist of the installation of new utilities, including water, sewer, and storm drainage systems; dry utilities; and new street lighting. In addition to the above, the project includes the signage, striping, and markings (SSM) design necessary for the proposed street improvements including about 7,500 linear feet of Class II and 4,500 linear feet of Class III bicycle lanes, along each side of: West D Street, East Bush Street and Follett Street (approximately 15,000-ft Class II and 8,800-ft Class III striping, total). Street, East Bush Street and Follett Street (approximately 15,000-ft Class II and 8,800-ft Class III striping, total). 1 Powell Avenue • New 5-ft Sidewalk, ~265-ft; • New ADA curb ramp; • New drive approaches (3); • Relocate 4-ft wrought iron fence at 105 Oleander Ave. 2 Smith Avenue (North of D Street) • New 5-ft sidewalk, curb and gutter, ~100-ft; • New drive approach; • Relocate existing overhead power pole. 3 Washington Drive • New 5-ft sidewalk, ~1,600 ft • New ADA curb ramps (4) • New ADA drive approaches (14) 4 Locust Street • New 5-ft Sidewalk, ~330 ft • New ADA drive approaches (3) 5 Walnut Street • New 5-ft sidewalk, ~240 ft • New ADA drive approaches (3) 6 Smith Avenue (South of D Street) • New Curb and Gutter & 5-ft sidewalk, including the southeast corner of Walnut St and Smith Ave; ~175-ft • New ADA drive approaches (2) 7 Oleander Avenue (East of Smith Ave) • 2inches of pavement grind and 2inces of overlay, ~15,600 sq. ft; • New curb and gutter+5-ft sidewalk, ~1,375-ft • New ADA drive approaches (11); • New AC pavement, 13,750 sq. ft, 3 inches of asphalt concrete and 6 inches of aggregate base • New streetlights (6) • Relocate power poles on the southside • Gas line extension (as required by City) 8 Oleander Extension • New curb and gutter & 5-ft sidewalk, ~1,000-ft • New AC pavement, 21,600 sq. ft, 3 inches of asphalt concrete and 8 inches of aggregate base • New sanitary sewer pipeline, 1,000-ft. • New storm sewer pipeline, 1,000-ft. • New water pipeline, 1,000-ft. 9 E Bush Street (northeast of D Street) • New curb and gutter, 320-ft • New 5-ft sidewalk, ~1,180-ft • New AC pavement, 2,100 sq. ft, 3 inches of asphalt concrete and 8 inches of aggregate base.

Contact Information

Name
Marissa Trejo,
Agency Name
City of Lemoore
Job Title
City Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Lemoore
Counties
Kings
Regions
Citywide
Cross Streets
Bush St at D St
Zip
93245
Total Acres
NA
Parcel #
NA
State Highways
190
Railways
SJVRR
Airports
NA
Schools
Jamison HS, Lemoore Elementary
Waterways
Lemoore Canal
Township
19S
Range
20E
Section
2/3
Base
MDB&M
Other Location Info
See the project description for a full list of streets included.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1 (Section 15301(c)) and Class 3 (Section 15303(d))
Reasons for Exemption
According to the attached findings worksheet, all the findings applicable to a Class 1 and Class 3 categorical exemption can be made. The project consists of infrastructure improvements and roadway enhancements such as ADA ramps and sidewalks along existing rights-of-way within the City of Lemoore. These improvements will be located within developed roadways and are being installed to comply with ADA requirements, thereby improving accessibility and public safety for pedestrians and the traveling public. The project will also provide enhanced pedestrian, bicycle, and vehicle amenities. This project does not propose an expansion of vehicular travel lanes. The project also proposes the extension of Oleander Avenue to D Street. This construction includes right-of-way extension with curb and gutters, sidewalks/pedestrian improvements, asphalt concrete roadway, and water, sewer, and storm drain utilities. This extension of Oleander Avenue to D Street is part of Lemoore’s General Plan buildout as outlined in the Circulation Element. This construction would service development consistent with the Lemoore General Plan. It would allow for improved pedestrian and vehicular travel, and as well as allow the City to more efficiently and effectively handle stormwater during rain events, thereby minimizing the potential of flooding and improving public safety. • Section 15301(c) Existing Facilities: Existing highways and streets sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of bicycle facilities, including, but not limited to bicycle parking, bicycle-share facilities, and bicycle lanes, transit improvements such as bus lanes, pedestrian crossings, street trees, and other similar alterations that do not create additional automobile lanes). • Class 3 15303(d) New Construction or Conversion of Small Structures: Water main, sewage, electrical, gas, and other utility extensions, including street improvements, of reasonable length to serve such construction.
County Clerk
Kings

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print