Streambed Alteration Agreement EPIMS No.52019 for Timber Harvesting Plan (THP) 2-24-00038-TRI Secret Squirrel
Summary
SCH Number
2024090717
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Streambed Alteration Agreement EPIMS No.52019 for Timber Harvesting Plan (THP) 2-24-00038-TRI Secret Squirrel
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2024
Document Description
The project is described in THP 2-24-00038-TRI and is limited to 9 encroachments including the installation of a temporary class I crossing, clearing of blocked culverts and installation of energy dissipater, removal of failed culverts and installation of new culverts, additional rock on road, excavation of channel, and the drafting of water.
Contact Information
Name
Kim Backes
Agency Name
Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Jon Woessner
Agency Name
CALFIRE
Job Title
Review Team Chair
Contact Types
Lead/Public Agency
Phone
Location
Counties
Trinity
Regions
Northern California
Township
36N
Range
7W
Section
3
Base
MD
Other Information
The project is located approximately 2 to 6 air miles northeast of Trinity Center on Squirrel Creek and Cedar Creek. Copper Creek Planning Watershed (1106.400704), Squirrel Gulch Planning Watershed (1106.400701) and Cedar Creek Planning Watershed (1106.400710) in the County of Trinity, State of California; Township 37N, Range 07W, Sections 21, 22, 27, 33, and 35; Township 36N, Range 07W, Section 3; Mount Diablo Base and Meridian; USGS 7.5 minute quadrangle, Carrville.
Notice of Determination
Approving Agency
Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.