Timber Harvest Plan “Franchini” 1-23-00018 SON (Streambed Alteration Agreement No. EPIMS-SON-40535-R3)
Summary
SCH Number
2024090617
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Timber Harvest Plan “Franchini” 1-23-00018 SON (Streambed Alteration Agreement No. EPIMS-SON-40535-R3)
Document Type
NOD - Notice of Determination
Received
Posted
9/17/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number EPIMS-SON-40535-R3 pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lily Engle.
The project is limited to water drafting from Franchini Creek, and installing two culverts at a Class II watercourse, four culverts at a Class III watercourse, five rocked fords at a Class III watercourse, and six temporary dips at a Class III watercourse.
Contact Information
Name
Kristin Garrison
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Counties
Sonoma
Regions
San Francisco Bay Area
Other Location Info
The project is located at unnamed tributaries to, and including, Franchini Creek in the County of Sonoma, State of California; Section 1, Township 10N, Range 1W, Section 30, Township 11N, Range 13W, and Sections 25, 26, 36, Township 11N, Range 14W; U.S. Geological Survey (USGS) Maps McGuire Ridge, Gube Mountain, Annapolis, and Stewarts Point, Mt. Diablo Base and Meridian.
Notice of Determination
Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
The final environmental impact report prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.