Suisun Marsh Salinity Control Gates Refurbishment Project- Suction Dredging Activities 2024

Summary

SCH Number
2024090473
Public Agency
California Department of Water Resources (DWR)
Document Title
Suisun Marsh Salinity Control Gates Refurbishment Project- Suction Dredging Activities 2024
Document Type
NOE - Notice of Exemption
Received
Posted
9/13/2024
Document Description
DWR plans to suction dredge excess sediment in Bay 2 of the Suisun Marsh Salinity Control Gates (SMSCG) to properly install a refurbished radial gates so SMSCG meets operational design. Dredged material will be pumped into a separation system, which will separate solids to be properly disposed of and filter water back to Montezuma Slough. The project is the most cost effect and practicable way to remove the sediment buildup and bring the SMSCG back to operational design.

Contact Information

Name
Eric Rinderle
Agency Name
California Department of Water Resources
Job Title
Senior HEPU Engineer; Project Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Erica Hironaka
Agency Name
CA Department of Water Resources
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency / Project Applicant

Location

Counties
Solano
Regions
San Francisco Bay Area
Waterways
Montezuma Slough
Other Location Info
Suisun Marsh Salinity Control Gates

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 4- Existing Facilities; California Code of Regulations, title 14, section 15301
Reasons for Exemption
The project is exempt because the removal of sediment is repair and maintenance of the existing Suisun Marsh Salinity Control Gates (SMSCG) facility. The SMSCG is an existing artificial waterway device used to control salinity in the Suisun Marsh to meet permit conditions of the State Water Project. This project will not result in impacts to special status species or habitat. Because this activity can be implemented without any significant environmental impacts, the Categorical Exemption Class 1 will be used for CEQA compliance.

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print