County Line Road Recharge Basin and Turnout Project

2 Documents in Project

Summary

SCH Number
2024080294
Lead Agency
San Gorgonio Pass Water Agency
Document Title
County Line Road Recharge Basin and Turnout Project
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2024
Document Description
San Gorgonio Pass Water Agency (SGPWA) proposes to construct the County Line Road Recharge Basin and Turnout Project (Project). The Project is a collaborative effort between SGPWA as California Environmental Quality Act (CEQA) Lead Agency and San Bernardino Valley Municipal Water District (San Bernardino Valley) as Responsible Agency, to provide imported water to communities located within the Cities of Calimesa and Yucaipa, and the communities served by South Mesa Water Company. The Project involves construction of a groundwater recharge basin south of County Line Road and west of 4th Street plus an additional approximately 956 linear feet of new pipeline along 4th Street to connect the recharge basin to the existing pipeline within County Line Road. The recharge basin will have a maximum excavation depth of 25-feet and 2.6-acres of infiltrating capacity on a 7-acre vacant site owned by SGPWA. A scientific groundwater monitoring well may be constructed adjacent to the recharge basin to a depth of up to 1,000 feet. The Project also includes an elevation control basin adjacent to the recharge basin in the event of the recharge basin overflowing. The elevation control basin has a surface area of 0.25-acre and storage capacity of 1.7 acre-feet. The Project will relocate an existing potable water pipeline from where it currently bisects the recharge basin property to the westerly property line. Buena Vista Court will also be repaved and improved with raised curbs and crown for a distance of approximately 600-feet. A Turnout Agreement between San Bernardino Valley and California Department of Water Resources, and an Operations Agreement between SGPWA and San Bernardino Valley are also part of the Project. Lastly, the Project also involves construction of a new turnout to connect the existing pipeline within County Line Road to the existing pipeline within Bryant Street (approximately 160 linear feet).

Contact Information

Name
Lance Eckhart
Agency Name
San Gorgonio Pass Water Agency
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Calimesa
Counties
Riverside
Regions
Citywide
Parcel #
411-150-027
Township
2S
Range
2W
Section
13, 14
Base
SBBM
Other Location Info
The Project site is located in portions of Bryant Street, County Line Road, Fourth Street, Buena Vista Court and APN 411-150-027 in the City of Calimesa, Riverside County, California within Sections 13 and 14, Township 2 South, Range 2 West, San Bernardino Base and Meridian, Yucaipa Quad

Notice of Determination

Approving Agency
San Gorgonio Pass Water Agency
Approving Agency Role
Lead Agency
Approved On
County Clerks
Riverside, San Bernardino
Final Environmental Document Available at
San Gorgonio Pass Water Agency, 1210 Beaumont Avenue, Beaumont, CA 92223

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print