Columbus Park Redevelopment Project
Summary
SCH Number
2024070568
Lead Agency
City of San Jose
Document Title
Columbus Park Redevelopment Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Open Space, Parklands and Habitat (OPSH)/Two Family Residential
Document Description
Public project to demolish all existing park facilities and recreational equipment on-site and construct two new soccer fields, lawn
practice areas, a kids’ soccer area, a play area, four pickleball courts, one futsal/pickleball/basketball court, and two new horseshoe
pitches. The redeveloped park would also include a picnic area, restrooms, a pedestrian paseo, two gravel surface parking lots, a 525-
square-foot maintenance building and a storage shed. The project would also vacate Spring Street between West Taylor Street and
Ashbury Street, reconfigure Irene, Asbury, and Walnut Streets to a one-way loop road around the site. The project would remove all
105 existing trees and plant 133 new 24-inch box trees.
Contact Information
Name
Bethelhem Telahun
Agency Name
City of San Jose
Job Title
Planner
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
West Taylor Street/Irene Street/ Spring Street/ Walnut Street
Zip
95110
Total Acres
10
Parcel #
259-07-115 and 259-08-103
State Highways
87
Railways
Southern Pacific
Airports
Norman Y. Mineta San Jose Intl.
Schools
Bellarmine College Preparatory
Waterways
Guadalupe River
Notice of Completion
Development Types
Recreational (Public Park )
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.