29 Wildwood Avenue Electric Vehicle Charging Station Project

2 Documents in Project

Summary

SCH Number
2024070515
Lead Agency
City of Piedmont
Document Title
29 Wildwood Avenue Electric Vehicle Charging Station Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Closed gas and auto repair station/Zone D/Mixed Use
Document Description
The proposed project involves the demolition of the existing gas and auto repair station at 29 Wildwood Avenue and construction of an electric vehicle (EV) charging station that would include a total of three covered charging areas, two with five EV charging stalls and one with four EV charging stalls. Seven EV charging kiosks/dispensers would be installed to serve the 14 EV charging stalls. Associated electrical equipment would be located within an approximately 200-square foot enclosure, on a concrete pad, located in the northeastern corner of the project site. A new 6-foot tall Trex fence would be installed along the rear property boundary and around the EV charging infrastructure. A public seating area with a picnic table, bench, and recycling bins would be provided in the central portion of the project site. Two benches would be provided adjacent to Wildwood Avenue. Twenty-two light fixtures would be installed throughout the project site. Two new canopies supported by laminated timber canopy beams and columns would also be installed. The proposed project would include installation of new signage, including four brand signs attached to the proposed canopies, three bay header signs also attached to the canopies and six freestanding brand specific signs.

Contact Information

Name
Kevin Jackson
Agency Name
City of Piedmont
Job Title
Planning & Building Director
Contact Types
Lead/Public Agency

Location

Cities
Piedmont
Counties
Alameda
Regions
San Francisco Bay Area
Cross Streets
Wildwood Avenue, Grand Avenue
Zip
94611
Total Acres
0.2
Parcel #
051-4638-014-00
State Highways
580
Schools
Wildwood Children's School
Other Location Info
The approximately 9,691-square-foot project site is located at 29 Wildwood Avenue in the City of Piedmont and consists of one parcel (Assessor's Parcel Number [APN] 051-4638-014-00). The project site is bounded by Wildwood Avenue to the south southeast, Grand A venue to the west, and single-family residential development to the north.

Notice of Completion

Development Types
Commercial (EV Charging Station)(Sq. Ft. 9691, Acres 0.2, Employees 1)
Local Actions
Use Permit, Design Review, Variance
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print