Courtright Intake/Discharge Gate, Cylinder, and Piping Improvements Project
2 Documents in Project
Summary
SCH Number
2024070236
Public Agency
State Water Resources Control Board
Document Title
Courtright Intake/Discharge Gate, Cylinder, and Piping Improvements Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/8/2024
Document Description
PG&E owns and operates the Haas-Kings River Project and the Helms Pumped Storage Project. PG&E seeks to implement the Courtright Project to replace hydraulic lines, cylinders, intake/discharge bulkhead gates, and bypass gates at Courtright Reservoir. PG&E also seeks to replace the existing oil spill containment domes at the Courtright Project site, which are ineffective at capturing hydraulic oil leaks, with a new system that seals to the top of the existing concrete structure and monitors the position of the intake/discharge gates while the gates are in operation. The replacement of intake/discharge-related infrastructure will not increase the generation capacity of the Haas-Kings River Project or the Helms Pumped Storage Project. On December 29, 2023, PG&E applied for a water quality certification from the State Water Resources Control Board (State Water Board) for the proposed work. This Notice of Exemption is for the State Water Board’s approval, as lead agency, of the water quality certification for the proposed Courtright Project.
Contact Information
Name
Eric Bradbury
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Fresno
Regions
Northern California
Zip
93664
Parcel #
13314002U, 13314001T
Waterways
North Fork Kings River, Helms Creek
Township
10 S
Range
27 E
Section
12
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
California Code of Regulations, title 14, section 15301 (Existing Facilities) and section 15302 (Replacement or Reconstr
Reasons for Exemption
Construction will only consist of replacing existing infrastructure that is beyond its serviceable lifetime or insufficient in preventing hydraulic oil discharges. Work within the Courtright Reservoir footprint will be limited to temporary improvement of existing roads inside the reservoir via grading and potential placement of cleaned crushed base rock. None of the exceptions to the categorical exemptions apply.
County Clerk
Fresno
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.