Timber Harvest Plan “Steam Donkey” 1-23-00099 SON (Streambed Alteration Agreement No. EPIMS-SON-46174-R3)

Summary

SCH Number
2024061168
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Timber Harvest Plan “Steam Donkey” 1-23-00099 SON (Streambed Alteration Agreement No. EPIMS-SON-46174-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2024
Document Description
The project is limited to eighteen culvert replacements, twelve crossing removals, one culvert installation, three ditch improvements, one rocked armored fill crossing, four temporary Humboldt crossings, and two water drafting sites, as denoted in the approved 1-23-00099-SON “Steam Donkey” Timber Harvest Plan.

Contact Information

Name
Laura O'Shea
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
unincorporated area
Counties
Sonoma
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located within the Big Pepperwood Creek (1113.850201), Mouth of Gualala River (1113.850202) and Black Point (1113.850304) planning watersheds. The project is located at tributaries to the Gualala River, the South Fork of the Gualala River, and the Pacific Ocean, in the County of Sonoma, State of California, German Land Grant, Mount Diablo Base and Meridian, USGS Quadrangles McGuire Ridge, Gualala, and Stewarts Point.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print