Turnout on the Friant-Kern Canal at Big Dry Creek Project

2 Documents in Project

Summary

SCH Number
2024061125
Lead Agency
Fresno Irrigation District
Document Title
Turnout on the Friant-Kern Canal at Big Dry Creek Project
Document Type
NOD - Notice of Determination
Received
Posted
8/9/2024
Document Description
The District and Fresno County are proposing to construct a new canal turnout that would divert and deliver water from the FKC into Big Dry Creek (BDC), which would provide direct recharge along the BDC channel north and east of the City of Clovis as well as other water deliveries downstream for recharge and other beneficial uses. The City of Clovis, and the unincorporated and mostly rural residential areas of the County of Fresno, would also benefit from the Project.

Contact Information

Name
Laurence Kimura
Agency Name
Fresno Irrigation District
Job Title
Chief Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Fresno
Counties
Fresno
Regions
Northern California
Total Acres
15
Parcel #
150-061-20T, 150-061-18; 150-061-46 and 150-061-47
Other Location Info
The proposed Project is located east of the City of Clovis in Fresno County, California, approximately 150 miles southeast of Sacramento and 105 miles northwest of Bakersfield. The Project site is located at mile post (MP) 14.6 on the west bank of the Friant-Kern Canal (FKC) near State Route 168E. The Project site is located within United States Bureau of Reclamation (USBR) right-of-way (ROW), which is known as Assessor’s Parcel Number (APN) 150-061-20T. The rest of the Project site is located on APNs 150-061-18; 150-061-46 and 150-061-47. The centroid of the Project site is 36° 52’ 12.30” N, 119° 35’ 46.22” W. The Project site or Area of Potential Effect (APE) is identified as approximately 15 acres for biological and cultural surveys.

Notice of Determination

Approving Agency
Fresno Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
District Office located at 2907 South Maple Avenue, Fresno, CA 93725

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print