PLNP2022-00353 StorQuest Storage Conditional Use Permit, Special Development Permit and Design Review
2 Documents in Project
Summary
SCH Number
2024060458
Lead Agency
Sacramento County
Document Title
PLNP2022-00353 StorQuest Storage Conditional Use Permit, Special Development Permit and Design Review
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2024
Document Description
The project consists of the following entitlements from the County of Sacramento:
1. A Conditional Use Permit to allow for a new self-storage facility on 1.43± acres in the Shopping Center (SC) zone.
2. A Special Development Permit to allow the proposed project to deviate from the following development standards:
• Front Yard Setback (Section 5.6.2.A, Table 5.14): Minimum front yard setback is 50 feet without a Public Utilities/Public Facility Easement (PUPF). The proposed project is providing 23 feet for a front yard setback.
• Loading Dock Setback (Section 5.6.2, Table 5.14): Loading docks shall be setback a minimum of 75 feet from the boundary of property zoned or used for residential purposes. As proposed, the loading area is located approximately 35 feet from the adjacent residential parcels.
• Vehicle Parking (Section 5.9.2.D, Table 5.22): One space for each employee, plus one space for each company operated vehicle; or one space for every 2,000 square feet of gross floor area, whichever is greater. For this project, a total of 43 parking spaces are required. The proposed project has a total of twelve vehicle parking spaces.
• Parking Stall Landscape (Section 5.2.4, Table 5.2): Rows of parking stalls, either open or covered, shall be broken up by a tree planting every seven spaces. The proposed project is not providing landscape islands or tree wells due to the parking lot layout.
• Parking Lot Shade (Section 5.2.4, Table 5.2): There is a 50 percent minimum parking lot shading requirement. The application states that the building will provide shade for seven parallel parking spaces and the canopy provides shade for two parking spaces.
• Fences and Walls (Section 5.2.5): A masonry wall of at least six feet in height shall be provided along the interior property lines for all industrial, commercial, and mixed-use projects when located adjacent to residential and agricultural-residential zoning districts, except where pedestrian connections are needed. The proposed project has a six foot high masonry wall along the existing residence, but not along the existing church facility that is residentially zoned.
3. A Design Review to determine substantial compliance with the Sacramento County Countywide Design Guidelines (Design Guidelines).
Contact Information
Name
Kris Steward
Agency Name
Plan Steward, Inc.
Contact Types
Project Applicant
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
255-0171-045
Notice of Determination
Approving Agency
Sacramento County Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.