Zeem Solutions Long Beach Depot LLC - EV Charging Station Installation and Associated Electrical Infrastructure Upgrades (Harbor Development Permit No. 24-001)

Summary

SCH Number
2024060409
Public Agency
Port of Long Beach
Document Title
Zeem Solutions Long Beach Depot LLC - EV Charging Station Installation and Associated Electrical Infrastructure Upgrades (Harbor Development Permit No. 24-001)
Document Type
NOE - Notice of Exemption
Received
Posted
6/11/2024
Document Description
Installation of 42 dual port electric vehicle chargers providing a total of 84 charging stations; upgrades to existing electrical infrastructure (transformers, switchgear, and distribution systems) to provide an additional 15 megawatts of power; and grade/asphalt improvements.

Contact Information

Name
Alyssa Rodriguez
Agency Name
Port of Long Beach
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Citywide, Southern California
Zip
90802

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 3
Reasons for Exemption
Section 15303 New Construction or Conversion of Small Structures (Class 3): The Class 3 Categorical Exemption consists of construction and location of limited numbers of new, small facilities or structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures from one use to another where only minor modifications are made in the exterior of the structure. The project involves the installation of 42 dual port electric vehicle chargers providing a total of 84 charging stations; upgrades to existing electrical infrastructure (transformers, switchgear, and distribution systems) to provide an additional 15MW; and grade/asphalt improvements. The Port has determined that none of the exceptions to the exemptions in the California Environmental Quality Act (CEQA) Guidelines Section 15300.2 foreclose the use of Categorical Exemption CEQA Guidelines Section 15303 (New Construction or Conversion of Small Structures); therefore, the Project is exempt from CEQA and no further environmental review is required.
County Clerk
Los Angeles

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print