Meadowbrook 1MG Tank and Booster Station Project

2 Documents in Project

Summary

SCH Number
2024051391
Lead Agency
State Water Resources Control Board
Document Title
Meadowbrook 1MG Tank and Booster Station Project
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2024
Document Description
The Applicant proposes to install a new one-million-gallon (MG) water storage tank and booster station with shade structure in Merced County. The Project also includes construction and installation of the following: an electrical building, chlorine building, transformer, backup generator, on-site piping from the new water storage tank to existing water mains, and security fencing with lighting. The Project is needed to meet Title 22 requirements and Cal Am’s planning criteria for effective water storage, volume, and pumping capacity to sustain peak demands and fire flow standards. The project would be constructed on Cal Am’s property adjacent to an existing Cal Am well.

Contact Information

Name
Adrian Dela Calzada
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Merced
Counties
Merced
Regions
Countywide
Cross Streets
Intersection of Santa Fe Drive and Bryant Road
Zip
95348
Parcel #
057-200-087
Railways
Burlington Santa Fe
Waterways
Black Rascal Canal

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On
County Clerk
Merced
Final Environmental Document Available at
265 West Bullard Avenue, Suite 150, Fresno, CA, 93704

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.