SBD-18 Baldwin Lake Pavement Rehabilitation

3 Documents in Project

Summary

SCH Number
2024051063
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
SBD-18 Baldwin Lake Pavement Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2024
Document Description
The California Department of Transportation (Caltrans) plans to rehabilitate a section of State Route 18 (SR-18) at Baldwin Lake, from 2.0 miles south of Holcomb Valley Road (PM 56.2) to Camp Rock Road (PM 66.9) in San Bernardino County. The work includes cold plane and overlay, repair of distressed pavement areas with digouts, construction of eight-foot-wide shoulders at PM 60.5 to 62.4 and PM 64.9 to 66.8, replace existing signage, enhance guardrail systems, remove existing Rock Slope Protection (RSP) and construct concrete channel lining at Cushenbury Creek bridge, construct median and shoulder rumble strips, and repair and upgrade culverts within the project limits.

Contact Information

Name
Malisa Lieng
Agency Name
California Department of Transportation
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Regions
Southern California, Unincorporated
State Highways
State Route 18
Other Location Info
Baldwin Lake, Holcomb Valley

Notice of Determination

Approving Agency
Caltrans, District 8
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
Caltrans, (District 8) 464 W 4th Street, San Bernardino, CA 92401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print