2024 Additional Erosion Repairs in Pool 22
Summary
SCH Number
2024051030
Public Agency
California Department of Water Resources
(DWR)
Document Title
2024 Additional Erosion Repairs in Pool 22
Document Type
NOE - Notice of Exemption
Received
Posted
5/22/2024
Document Description
San Joaquin Field Division (SJFD) plans to repair additional erosions located in pool 22 along the aqueduct access road. Staff will repair erosions by compacting erosions with a sheepsfoot attached to a backhoe, or a whacker packer. A backhoe or loader would be used to add dirt. Base material would be transported to the site via a dump truck. A loader would be used to load base material into the dump truck. A water truck may be used to control dust and aid in compaction. The work is estimated to take 30 days to complete. All work would be completed within DWR’s right of way. This work is necessary to maintain the access road.
Contact Information
Name
Elizabeth Maldonado
Agency Name
Department of Water Resources, San Joaquin Field Division
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Kettleman City
Counties
Kings
Regions
Citywide, Unincorporated
Other Location Info
Start (Check 21): 36°00'43.1"N 119°58'33.7"W
Mid Point (Utica Ave): 35°56'03.4"N 119°55'46.4"W
End (Check 22): 35°51'02.9"N 119°53'25.9"W
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301 (b)
Reasons for Exemption
This project consists of maintenance activities that support the function of the California Aqueduct and water delivery within the State Water Project.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.