Streambed Alteration Agreement EPIMS No. CAL-50942-R2 (Hanging Schaad Timber Harvesting Plan 4-23-00186-CAL, Sierra Pacific Industries)

Summary

SCH Number
2024050969
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement EPIMS No. CAL-50942-R2 (Hanging Schaad Timber Harvesting Plan 4-23-00186-CAL, Sierra Pacific Industries)
Document Type
NOD - Notice of Determination
Received
Posted
5/21/2024
Document Description
The projects are limited to two water drafting sites with modifications, two temporary Spittler crossings, and four permanent crossings (three culvert crossings and one rocked ford). Further explanation of the work can be referenced within the THP 4-23-00186-CAL.

Contact Information

Name
Carlee Cockrum
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Calaveras
Regions
Northern California
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in Calaveras County, within CALWATER watershed Schaads Reservoir and its connecting tributaries; Township 7N, Range 15E, Sections 21-32, Township 7N, Range 14E, Section 36, Township 6N, Range 14E, Sections 1-3 and 10-15, and Township 6N, Range 15E, Sections 5-8 and 17-18; U.S. Geological Survey (USGS) Quad Maps Garnet Hill and Devils Nose; Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print