Mission Union School Water System Improvements Project

2 Documents in Project

Summary

SCH Number
2024050926
Lead Agency
Mission Union School District
Document Title
Mission Union School Water System Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2024
Document Description
The project involves demolition of an existing 225 gallon per minute well and installation of a new well at the Mission Union School District, located at 36825 Foothill Rd, Soledad, CA 93960. The proposed project would cover approximately 781 sf and includes a well, construction of a potable water storage tank, a water booster pump system, and a backup propane generator. Well installation would involve a well screen interval between 394 and 700 ft to reach groundwater not afflicted with nitrate contamination.

Contact Information

Name
Dr. Ricardo Espinoza
Agency Name
Mission Union School District
Job Title
Superintendent
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Soledad
Counties
Monterey
Regions
Unincorporated
Cross Streets
Foothill Road
Zip
93960
Total Acres
5.71
Parcel #
165-031-008-000
State Highways
N/A
Railways
N/A
Airports
N/A
Schools
Mission Union Elementary
Waterways
Arroyo Seco River
Other Location Info
Project is located southwest of the City of Soledad on the 5.71-acre Mission Union School campus. Permanently impacted area is approximately 781 sf.

Notice of Determination

Approving Agency
Mission Union School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
https://www.missionusd.org/news

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print