Bradley-San Ardo Capital Preventive Maintenance (CAPM)
3 Documents in Project
Summary
SCH Number
2024050493
Lead Agency
California Department of Transportation, District 5
(DOT)
Document Title
Bradley-San Ardo Capital Preventive Maintenance (CAPM)
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2024
Document Description
Caltrans proposes to rehabilitate pavement wear course and improve 16 drainage culverts within a 12.8-mile-long section of U.S. 101 from post mile R9.2 to R22.0 in Monterey County. The project will replace nonstandard metal beam guardrail and end treatments, replace sign panels that do not use the Type XI reflective backing, install 14 traffic count stations, install one vehicular detection system, place vegetation-control crushed shale, and construct shoulder backing, where possible.
Contact Information
Name
Matt Fowler
Agency Name
California Department of Transportation District 5
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Email
Location
Coordinates
Counties
Monterey
Regions
Countywide
Cross Streets
US 101 & Jolon Rd; US 101 & Paris Valley Rd/Cattlemen Rd
Zip
93450
Total Acres
Not Applicable
Parcel #
Various
State Highways
US 101
Railways
Union Pacific RR Coast Line
Airports
None
Schools
Bradley Elementary and San Ardo Middle
Waterways
Salinas River
Township
24S
Range
10E
Section
1
Base
MtDiablo
Other Location Info
US 101 from Jolon Road to Paris Valley Road/Cattlemen Road
Notice of Determination
Approving Agency
California Department of Transportation District 5
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.