240 G Street Mixed Use Project

Summary

SCH Number
2024050194
Public Agency
City of Davis
Document Title
240 G Street Mixed Use Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/6/2024
Document Description
The project will redevelop a downtown site with a new 6-story mixed-use infill project. The project includes demolition of existing structures and design review for construction of an approximately 139,510 square-foot building with commercial street frontage, 126 apartment units, and subterranean parking. Residential units will comprise a mix of studios, one, two, and three-bedroom units and include 120 apartment units and 6 live-work units. The building features a ground floor commercial space and live-work units, indoor residential bike parking, a landscaped roof deck, and related service and utility areas, tree removal, landscaping and site improvements. The application also includes an Affordable Housing Plan to provide 5% of the units (6 units) as affordable units to low-income households.

Contact Information

Name
Eric Lee
Agency Name
City of Davis, Community Development and Sustainability Department
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
John Eudy
Agency Name
240 G Partners LLC
Job Title
Applicant
Contact Types
Project Applicant

Location

Counties
Yolo
Regions
Citywide
Cross Streets
240 G Street
Zip
96616
Total Acres
0.67
Jobs
8
Parcel #
070-252-15
State Highways
I-80
Railways
U.P.R.R
Schools
various
Waterways
Putah Creek

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15332
Reasons for Exemption
The project is categorically exempt from environmental review pursuant to section 15332 of the CEQA Guidelines which exempts infill development projects that are consistent with the general plan and zoning designation. The project is 6-story mixed use project with ground floor commercial and 126 residential units located on an existing developed downtown site, which will be redeveloped for the project. It is consistent with the General Plan and Zoning as described below. The proposed project is consistent with the Downtown Davis Specific Plan Environmental Impact Report (EIR) (SCH# 2020100103), which was certified by the City on December 13, 2022. The EIR evaluated the environmental impacts of the redevelopment of downtown Davis as envisioned in the Downtown Davis Specific Plan and implemented in the Form Based Code with up to 1,000 new residential units and up to 600,000 square feet of new commercial space. The EIR identified environmental impacts of the envisioned downtown redevelopment, including significant and unavoidable impacts, and also identified mitigation measures. Per CEQA Guidelines Section 15162(a), the proposed project does not require further environmental review if the proposed project would not result in new significant impacts or new significantly changed mitigation measures. The proposed Davis Lumberyard project is located within the Downtown Davis Specific Plan area and the project is consistent with the Specific Plan and Zoning of the site. The project is consistent with the scope of the impacts analyzed in the Downtown Davis Specific Plan EIR. It does not involve any new significant environmental effects or a substantial increase in the severity of previously identified significant effects that were not previously identified in the EIR. Therefore, no additional environmental review is required.
County Clerk
Yolo

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print