Phelan Pinon Hills Community Services District Reservoir 6A-2 Project
2 Documents in Project
Summary
SCH Number
2024050164
Lead Agency
Phelan Pinon Hills Community Service District
Document Title
Phelan Pinon Hills Community Services District Reservoir 6A-2 Project
Document Type
NOD - Notice of Determination
Received
Posted
9/3/2024
Document Description
The District seeks to install a 1.5 million gallon (MG) reservoir at the District’s existing Reservoir 6A site. The proposed 1.5 MG Reservoir 6A-2 would be installed within Assessor’s Parcel Numbers (APNs) 3037-071-06 and 3037-071-08, which are owned by the District. The size of the whole of the project site, inclusive of the existing 0.4 MG Reservoir 6A, is 1.01 acres, but the area of disturbance is anticipated to be less than one acre as no modifications to the existing Reservoir 6A are proposed. The purpose of the proposed project is to provide additional storage capacity for pressure zone 6. The new reservoir will also allow for the existing reservoir to be taken out of service when required for routine maintenance.
Contact Information
Name
George Cardenas
Agency Name
Phelan Pinon Hills Community Services District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Phelan
Counties
San Bernardino
Regions
Southern California
Cross Streets
Javelin Road and Snow Line Drive
Zip
92372
Total Acres
<1
Parcel #
3037-071-06, 3037-071-08
State Highways
138
Schools
Serrano High, Pinon Mesa Elementary
Waterways
California Aqueduct
Township
4N
Range
7W
Section
26
Base
SBBM
Notice of Determination
Approving Agency
Phelan Pinon Hills Community Service District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
4176 Warbler Road, Phelan, California, 92371 and https://www.pphcsd.org/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.