Site Plan Review No. 23-002

2 Documents in Project

Summary

SCH Number
2024050082
Lead Agency
City of Lancaster
Document Title
Site Plan Review No. 23-002
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2024
Document Description
The 35th Street and Avenue H Project (project) would include construction of an industrial warehouse building and associated improvements on 20.15 acres of vacant land within the existing Fox Field Industrial Corridor Specific Plan. The proposed project would provide 395,390 square feet of industrial/warehouse space and include associated improvements, such as loading docks, tractor-trailer stalls, passenger vehicle parking spaces, stormwater detention basins, and landscape area. There would be 10,000 square feet of office space on the ground floor. The building would have a maximum height of 35 feet, measured from the finished floor to the top of the building and would have a gross floor area ratio of 0.5. The project would include seven detention basins on site: one located on the southeast corner, one located on the northeast corner, and five located along the west portion of the project site to detain and treat stormwater runoff. The project would include off-site improvements along 35th Street West and Avenue H, including frontage landscaping, pedestrian, and street lighting improvements. A variety of trees, shrubs, plants, and ground covers would be planted within the project frontage’s landscape setback area, as well as within the landscape areas found around the proposed industrial/warehouse buildings and throughout the project site. Access to the project site would be provided by two driveways: the Avenue H south driveway and the 35th Street West north driveway, both of which would provide full access (trucks and passenger vehicles). To facilitate adequate on-site circulation and sufficient site access for both passenger vehicles and trucks, as well as to ensure efficient off-site circulation on nearby roadway facilities, the project would include off-site improvements that include street improvements along the frontage of the project on Avenue H and 35th Street West, and improvements within 35th Street West. A tenant for the project has not been identified and the industrial warehouse building is considered speculative. Business operations would be expected to be conducted within the enclosed building, with the exception of the ingressing and egressing of trucks and passenger vehicles accessing the site, passenger and truck parking, the loading and unloading of trailers within designated truck courts/loading areas, and the internal and external movement of materials around the project site via forklifts, pallet jacks, yard hostlers, and similar equipment. It is anticipated that the facilities would be operated 24 hours a day, seven days a week. Cold storage would not be permitted.

Contact Information

Name
Kendall Brekke
Agency Name
City of Lancaster, CA
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Lancaster
Counties
Los Angeles
Regions
Citywide
Cross Streets
35th Street West and Avenue H
Zip
93536
Total Acres
20.15
Jobs
134
Parcel #
3107-026-077 and -079
State Highways
SR-14
Airports
General William J. Fox Airfield
Schools
Desert View Elementary
Waterways
Amargosa Creek
Township
07N
Range
12W
Section
6
Base
SBBM

Notice of Determination

Approving Agency
City of Lancaster, CA
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.cityoflancasterca.org/our-city/departments-services/development-services/planning/environmental-review/initial-studies

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print