Guadalupe Active Partnership for Signalization and CAPM to Santa Maria (GAPS-CAPM)
3 Documents in Project
Summary
SCH Number
2024041206
Lead Agency
California Department of Transportation, District 5
(DOT)
Document Title
Guadalupe Active Partnership for Signalization and CAPM to Santa Maria (GAPS-CAPM)
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2024
Document Description
Perform a Capital Preventative Maintenance (CAPM) project on SR 1 and SR 166 with intersection improvements, in Santa Barbara County. Traffic signalization will be incorporated at the State Route 1/State Route 166 and Obispo Street/State Route 166 intersections. Improvements will be made on the Union Pacific Railroad at-grade crossing with the inclusion of a pre-signal. The project includes replacing and adding Transportation Management Systems, removing and adding single-post and two-post signs, replacing sign panels, and rehabilitating or reconstructing sidewalk curb ramps to meet Americans with Disabilities Act standards.
Contact Information
Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency
Address
Phone
Location
Counties
Santa Barbara
Regions
Southern California
State Highways
SR 1, SR 166
Other Location Info
State Route (SR) 1 from postmile (PM) 48.9 to PM 49.3, and on SR 166 from PM 0.0 to PM 8.9, in Santa Barbara County.
Notice of Determination
Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Barbara
Final Environmental Document Available at
Caltrans District 5, 50 Higuera Street, San Luis Obispo, CA 93401
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.