Olive Park Apartments Project

3 Documents in Project

Summary

SCH Number
2024040851
Lead Agency
City of Oceanside
Document Title
Olive Park Apartments Project
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2025
Document Description
The Parcel Area has a General Plan designation of Medium Density Residential (MDA-R) and a zoning designation of RS-Single Family Residential. The approved project consists of 199 low-income and very low-income multi-family units (00% affordable) on 6.11 acres of the 43.50-acre lot. The remaining 32.63 acres would be placed in a conservation easement for the protection of open space and biological resources. Site access would be provided via the terminus of Olive Drive and a direct pedestrian/bicycle connection from the Parcel Area to the NCTD College Boulevard Sprinter Station would be provided. The project proposed, and was granted, Density Bonus Law waivers/incentives. The project is consistent with the General Plan land use designation and located within a Transit Priority Area.

Contact Information

Name
Shannon Vitale
Agency Name
City of Oceanside
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Capstone Equities
Agency Name
Capstone Equities
Contact Types
Project Applicant

Location

Cities
Oceanside
Counties
San Diego
Regions
Citywide
Cross Streets
See "Other Location Info" field
Total Acres
43.50
Parcel #
162-111-04
Other Location Info
South of Oceanside Boulevard and west of College Boulevard; west of the terminus of Olive Drive and south of the North County Transit District (NCTD) rail line and College Boulevard Sprinter Station

Notice of Determination

Approving Agency
City of Oceanside
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, Planning Division Counter, and 300 N. Coast Highway, Oceanside, California

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Download CSV Download All Attachments New Search Print