Rancho Santa Margarita Recycled Water System Project
2 Documents in Project
Summary
SCH Number
2024040817
Lead Agency
Santa Margarita Water District
Document Title
Rancho Santa Margarita Recycled Water System Project
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2024
Document Description
Construction and operation of infrastructure to extend the Santa Margarita Water District's recycled water system into the City of Rancho Santa Margarita and adjacent unincorporated County of Orange land. Preliminary planning-level design indicates the project would install approximately 95,000 linear feet of pipes, mostly beneath paved roads. A new above-ground reservoir and pump station would be constructed adjacent to an existing District tank north of Los Alisos Bl. A new pump station would be constructed adjacent to the Portola Reservoir. The Eastbrook Pump Station would be expanded to provide additional pumping capacity.
Contact Information
Name
Tricia Butler
Agency Name
Santa Margarita Water District
Job Title
Chief Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Mission Viejo, Rancho Santa Margarita
Counties
Orange
Regions
Southern California
Other Location Info
Multiple locations. in Rancho Santa Margarita, Mission Viejo, and unincorporated Coto de Caza, Orange County
Notice of Determination
Approving Agency
Santa Mararita Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
Santa Margarita Water District, 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.