Combie and Ophir 2&3 Siphon Replacement Project
2 Documents in Project
Summary
SCH Number
2024040082
Lead Agency
Nevada Irrigation District
Document Title
Combie and Ophir 2&3 Siphon Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2024
Document Description
The Combie and Ophir 2&3 Siphon Replacement Project (Project) involves the replacement of three existing underground siphon pipelines. These siphons are each over fifty years old, are nearing the end of their useful life, and require resizing to address approved future flow needs. The siphons are part of NID’s Combie & Ophir 2 and 3 raw water delivery system
Contact Information
Name
Adrian Schneider
Agency Name
Nevada Irrigation District (NID)
Job Title
PE
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Placer
Regions
Countywide
Other Location Info
The Project Site is located in Placer County, in the North Auburn area, primarily east of Highway 49 and north of Bell Road with siphon crossings of Orr Creek, Dry Creek and Rock Creek. The Project corresponds to a portion of Sections 9, 16, 21, 22, 28, and 29, Township 13 North, Range 8 East (Mount Diablo Base and Meridian) of the “Auburn, California” 7.5-minute quadrangle and is located within the Upper Coon-Upper Auburn Watershed (Hydrologic Unit Code [HUC] #18020161).
Notice of Determination
Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
https://www.nidwater.com/combie-and-ophir-siphons-2-3-replacement-project
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.