Eastbluff Elementary School Improvement Project

Summary

SCH Number
2024031101
Public Agency
Newport-Mesa Unified School District
Document Title
Eastbluff Elementary School Improvement Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/28/2024
Document Description
The proposed project would convert two existing classrooms into TK classrooms and construct five new modular classrooms and one modular restroom. The two existing classrooms that are proposed to be converted are located in Building C, Rooms C1 and C6. These converted classrooms will ensure the classrooms are ready for the new TK students. The five new modular classrooms and modular restroom will be located in the eastern portion of the campus. These modular classrooms and restroom will help make room for the 40 incoming TK students. The District proposes various improvements to the existing Eastbluff ES which includes improvements to administration building; extending the pick-up/ drop-off and parking lot; a new trash pickup area; reorientation of classrooms within Building C; construction of a new TK restroom; removal and expansion of fencing for a new shared TK/K area; access improvements to the Building F restrooms; the addition of a new room use (Parent Teacher Education); and construction of five modular classrooms and a modular restroom building. Improvements to Administration building, specifically the school/community facilitator, vice principal, counselors office and storage room, would include internal finishings and technological upgrades. The proposed project would add a new restroom entrance, thereby removing the existing restroom entrance, of the Building F restrooms to accommodate more access and workspace for the speech & occupational therapy room. The proposed project would include extending the pick-up/ drop-off and parking lot, and installation of associated signage. The project would remove the existing curbs between the two parking lots so they are connected and would relocate the egress driveway approximately 100 feet east. Thereby allowing additional pick-up/ drop-off capacity on campus. Extending the pick-up/ drop-off and parking lot would require moving the existing trash pick-up area to the beginning of the maintenance/fire access lane of campus. The project would require reorientation of classrooms within Building C, which includes the conversion of two classrooms into TK classrooms, moving two Grade 1 classroom in Building C to different rooms within Building C, and the addition of a new parent/teacher education room. The room within the center of Building C would become a new restroom for TK uses. The reorientation of Building C would allow for TK/K classrooms to be within the same area and share a play area. The proposed project would remove the existing fencing to extend the shared play area and install a share structure for a TK covered lunch location. The proposed project would construct five modular classrooms and a modular restroom building, to accommodate the existing classrooms C3, C4, and C5 to modular classrooms and a new one music modular classroom. The proposed project will benefit the district, students, and staff by improving the educational environment and safety.

Contact Information

Name
Erica DiCioccio
Agency Name
Newport-Mesa Unified School District
Job Title
Facilities Planning Coordinator
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Regions
Southern California
Zip
92660
Parcel #
440-221-02

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, CCR §15301, Existing Facilities
Reasons for Exemption
The proposed improvements at the existing administration building; the relocation of the trash pickup area; reorientation of classrooms within Building C; access improvements to Building F restroom; and the addition of a new room use (Parent Teacher Education) uses on campus are exempt from CEQA under Class 1, Existing Facilities (Section 15301), which includes interior or exterior alterations, involving such things as interior partitions, plumbing, and electrical conveyances and restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment. Administration building improvements would include replacing and upgrading the interior furnishing and technology. The reorientation of Building C classrooms and the access improvements for Building F restrooms would not expand the existing building and would still serve the same function and purpose as before. The relocation of the trash pickup area would be considered a miner alteration of existing public facilities. The improvements would not alter the basic functions of the facilities and would not increase student capacity. Thus, the proposed project would be exempt from CEQA review pursuant to CEQA Guidelines Section 15301. Since the renovations are located in the same site and will not expand any renovated structure, the project is exempt from CEQA under Section 15301.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 3, CCR §15303, New Construction or Conversion of Small Structures
Reasons for Exemption
The proposed construction of a lunch shade structure, extending fencing and the construction of a new TK restroom are exempt from CEQA under Class 3, New Construction or Conversion of Small Structures (Section 15303). The proposed shade structure and fencing are small new structures that will be located within the school campus. Additionally, the construction of a new restroom would occur within a small existing room and would require the installation of small restroom equipment to accommodate the TK classrooms. The shade structure and fencing improvements will create an enlarged TK/K area on campus to serve students on campus and not increase student capacity; the project is exempt from CEQA under Section 15303.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 11, CCR §15311, Accessory Structures
Reasons for Exemption
The proposed extension the vehicle drop-off area and parking area is exempt from CEQA under Class 11, Accessory Structures (Section 15311). The extended vehicle drop-off area will be located in the front of Eastbluff ES and the removed parking would be replaced by the extended parking area with associated signage will be consisted accessory structures for elementary school use, the project is exempt from CEQA under Section 15311.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 14, CCR §15314, Minor Additions to School
Reasons for Exemption
The proposed construction of five modular classroom and modular restroom building is exempt from CEQA under class 14, Minor Additions to Schools (Section 15314). The five new modular classroom buildings will be located within the school campus and will increase the total number of classrooms by five and would not increase student capacity by more than 25 percent. The five modular classrooms would be required to accommodate the TK/K program and existing students on campus and would not itself increase student capacity on campus. Additionally, the student population will increase by 40 students, which is an approximately 10 percent increase in the student population. Consequently, the project would not increase student capacity by more than 25 percent. Since the new buildings would be located within the same campus and will not increase the school classrooms by ten nor increase student capacity by 25 percent, the project is exempt from CEQA under Section 15314.
County Clerk
Orange

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print